What is the Process for a Level Two (Major) TIA?

A Level Two TIA will require, at a minimum, a site plan review, trip generation capacity analysis and the use of the TDM/MMLOS tool to determine trip mitigation. The contents of a Level Two TIA will vary based on the nature of the proposed project. Please see page 20 of the TIA Guidelines document for more information.

Show All Answers

1. What is a Transportation Impact Analysis?
2. Why does the City of Aspen require a TIA?
3. How do I know if my project is exempt, minor or major and what will be required?
4. What is the Process for a Level One (Minor) TIA?
5. What is the Process for a Level Two (Major) TIA?
6. Why is a narrative required?
7. What is TDM?
8. What is MMLOS?
9. Can I pay a fee or buy an item as mitigation?
10. How can I determine which measures will work for my project?
11. What if I don’t know what businesses will be in the building once my project is complete?
12. Can I receive credit for items currently in place?
13. Can I receive credit for a measure more than once?