The Engineering Department must review permit applications that meet certain thresholds. If these thresholds are met, applicants must schedule a pre-submittal sufficiency review meeting with a Development Engineer.
The thresholds for Engineering Department review of permit applications are:
Review the Complete Engineering Review Thresholds and Requirements.
If your project requires an Engineering sufficiency review meeting, complete the sufficiency checklist (PDF) and supporting documents prior to this meeting, as they will be reviewed during the meeting.
If the Engineering review thresholds are met, the Development Engineer’s signature on the sufficiency checklist (PDF) is required to submit a permit application.
All Engineering requirements and standards are laid out in the Engineering Design Standards document. Additional thresholds and requirements for your project are described on our Understand Permit Requirements page.
To schedule a sufficiency review meeting with Engineering, contact the Engineering Intake staff.